IIn the past 22 years, the manufacturers of Vi2000 CONSTRUCTION COMPLETE, have been repeatedly addressed by customers on why we are "only" supporting selling, planning, presenting, calculating and sampling within the Vi-world.

This is our answer: For more than six years, we have been working together with the colleagues from the company GSD (Gesellschaft für Software, Entwicklung und Datentechnik mbH) and several users to develop our vision of a software-based, process-oriented business management: Vi Project!

The basic idea is simple and clear. Everything runs in one integrated system. The actual result may go much further - even for you. It is ONE system: From address management to document management, from order placement and accounting to construction scheduling and the build log, from service to defect management and controlling – AND everything is process-controlled by means of user-defined workflows.

Today, it is common practice among our users that the software for executing construction work informs the company if something is NOT running according to the predetermined processes. This vision can become reality for you with a configured Vi calculation and DOCUframe as a base!
 
 
Central components
 
  • Project information management
  • Project billing
  • Construction schedule - graphical / non-graphical process management
  • Workflow - automatic distribution of work / deadline management
  • Order placement - tendering / contracting / billing
  • Construction diary / customer service - construction progress tracking / defect management
  • Document management - Document creation / archiving
  • Project confirmation / billing
  • Supplementary work administration
  • Supplementary work with / without billing the customer
  • Order confirmation / supplementary work confirmation
  • Freely definable payment plans with references dates from the construction schedule
  • Partial invoice / partial final invoice / final invoice
  • Direct billing of supplementary works with the partial invoices
  • Percentaged settlement of supplements with partial invoices (incl. recalculation on already invoiced partial payments)
 
 
Letting/procurement
 
 
 
  • Supplier management:
      •  Deployment regions l supplier prices l payment plans l order placement deductions l document management
      •  Rating score with exclusion of order placements
 
 
 
 
  • Tender:
      •  Profit / loss determination for calculation l bidders comparison l optimum bidder
      •  Monitoring of the tender (workflows at request / oder placement via calculation)
 
 
  • Supplier price management:
      •  Any supplier price lists l Local deployment regions with automatic consideration when placing orders
        
 
  • Order placement / contracting:
      •  Order placement/ supplementary placements  § 13b UStG   l  invoice receipts (billed / outstanding)
      •  Automatic detection of alteration in services in case of project modifications
      •  Text libraries l consideration of supplier payment plans
      •  Automatic assignment deductions (portable toilette, container use)
 
 
 
 
  •     Controlling – evaluating order placement profits:
      •  Order placement profits
 
 
 
Construction schedule
 
  • Control system for ALL appointments during the project:
      •  Forward / midpoint / backward scheduling
      •  Multi-level operations incl. non-graphical sub-operations and activity entries
      •  Graphical display:

 


      •  Non-graphical display (appointment overview):
 
 
 
 
  • Planned dates for various functions in the construction process:
      •  billing / final invoice  l placement l workflows
 
  • Actual dates:
      •  Feedback l workflows
 
 
 
 
 
  • Workflow management:
      •  Bearbeitungsdokumentation/-zeitmeldungen (notifications on  timekeeping, specified time levelling)
      •  Transaction-based document creation l document management
 
 
  • Multi-project overviews:
      • Graphical display of processes across multiple projects
      • Freely definable process compilation l Freely definable time horizon
      • Resource-based evaluations relating to roles: "All projects of the masons"
      • Resource-based evaluations relating to address: "All projects of the electrician Miller"
 
 
Workflow
 
Control system for distribution of work and (schedule) controlling
 
  • Time scheduling:
      •  For example, ready message triggers the setting of a start date: Presence of the building permit and completion of sampling starts the process "detailed design"
        
  • Process distribution:
      •  For example, ready message triggers the sending of a process to the inbox of a person in charge:
         Presence of building permit and completion of sampling shifts the process "detailed design" to a designer
 
  • Start date reminder:
      •  For example, start date reminder before the beginning of works: 48 hours before the start of concreting the concrete ceiling, the heating contractor receives a memo reminding them to insert the boiler in the basement
      • If a reportable process has not been reported as being started in time, the executer of the task receives a reminder: If the beginning of the external plaster works has not been reported as started 24 hours after the planned start date, a control message is sent to the plasterer and the project leader
 
  • Status setting:
      •  For example, with the beginning of a process, a project status is set: The beginning of excavation works sets the project status to "under construction"
 
 
 
 
  • Target time monitoring
      •  When a percentage value of the planned target time has been reached, a notification is sent: When 90% of the target time for drawing up the building application are reached and no notification of completion was sent, an email is sent to the planning manager to control the status of the work.
 
 
  • Deadline monitoring / escalation management:
      •  Missing start or end notifications trigger a multistage escalation workflow: 24 hours
        after failure to send end message "screed works", an email is sent to the screed installer and the construction supervisor, after 48 hours an email is sent to the project manager, after 96 hours, an email is sent to the management.
 
  • General deadline monitoring outside the construction schedule:
      •  Expiration of reservation periods l expiry of supplier price agreements
      •  Expiration of the validity of documents (e.g. insurance certificates)
 
  • General monitoring of construction diary / customer service:
      •  Expiration of notification (grace) period for defects
 
 
Construction process documentation
 
  • Central point of information for the construction process documentation:
      •  Construction site (log entries / construction activities / faulty materials / defects) l list evaluations
      •  In-house (log entries) l document management / attachments l automatic log shipping to
         various distribution keys with individual protocol content and attachments
        
 
 
 

Remedy of defects

 
 
 
 
 
  • Remedy of defects:
      •  deadline, grace period, substitute performance, execution
      •  Document management l list analyses l transaction-based document creation
      •  Automatic log shipping to various distribution keys with individual log content
         and attachments  l transfer from construction diary recordings l  processing documentation
 
 
 
List configuration
 
  • Freely definable evaluations:
      •  Freely definable content (project overviews, order placement evaluations, evaluation of reimbursements)
      •  Freely definable display incl. colored display of dates (delays!)
      •  Exportable to MS Excel l shortcut to the objects listed
 
 
 
 
BulletProspekt Vi Prospekt
Prospekt Vi Projekt | .pdf file   
BulletSie suchen Kontakt zu Vi Architekten?
Wenn die Bauanträge NICHT im eigenen Haus erstellt werden, sollten Ihre Partnerarchitekten in jedem Fall mit Vi arbeiten. Die Vorteile "liegen auf der Hand". Die Vorplanung wird für den Bauantrag weiter detailiert UND die fertige Bauantragsplanung können Sie im eigenen Haus weiter verwenden. Zum Beispiel für die automatische Kalkulation des Nachtragsangebots - vorausgesetzt, Sie arbeiten mit Vi Kalk.
 
BulletKundenstatement - Adlerhaus
Marco Adler
Adlerhaus GmbH
(Nordhalben)
Es ist fast unglaublich, was 
man mit der Kalkulation alles
anstellen kann.
Entdecke die Möglichkeiten ... Es ist fast unglaublich, 
was man mit der Kalkulation alles anstellen kann.
Gerade die vielen Änderungswünsche der Kunden
sowie die ständigen Fragen nach Eigenleistungen
und die daraus resultierenden Kostenänderungen,
brachten mich in der Vergangenheit (vor Vi2000)
manchmal zur Verzweiflung. Heute ist es ein Klacks
oder vielleicht besser Klick um darauf zu reagieren.
Ich merke deutlich, dass dies bei den Kunden sehr
gut ankommt. Man trifft sehr selten auf ein Unterneh-
men, das sich für den Kunden so stark engagiert!
BulletKundenstatement - BauUnion1905
BulletYouTube - einfach mal reinschauen
Auf unserem Kanal "softwareparadies" finden Sie zahlreiche Rubriken zu Vi2000. Hilfevideos und Lehrgänge stehen Ihnen hier ebenso, wie Seminar- und "Übungsvideos zum Mitmachen" zur Verfügung.
BulletVi Projekt - funktionelle Rollen
BulletKundenstatement - Edelsteinhaus
Ralf Sperling
Edelsteinhaus GmbH
 
Back to the roots – nachdem wir kurzzeitig auf computer-
technischen Irr- bzw. Abwe-
gen waren ...
 
... freuen wir uns auf eine gemeinsame Zusammenarbeit in Punkto EDV-Gesamtlösung mit Vi2000 von swp! Nach intensiver, fast 3-monatiger Testphase mit dem Programm xxx der Firma xxx mussten wir feststellen, dass die von Ihrem Mitbe-
werber in seiner Werbung und Produktpräsentation getroffenen Aussagen über die Leistungsfähigkeit der Software keinesfalls den Anforderungen bzw. der Anwendungsrealität entsprachen.
BulletVi Projekt - Ereignisprotokoll
BulletNewsletter - immer 'up to date'
Profitieren auch SIE monatlich von unseren Tipps und Tricks, Veranstaltungsterminen und unseren spannenden Lehrgängen. Melden Sie sich JETZT an!


Ich stimme den Datenschutzbedingungen zu.*


Folgende Felder bitte frei lassen!